HTSE deploys IEEE 1070 & IEC certified ERS Towers to support Transmission Tower Relocation and Transmission Line Shifting during highways, railways, metros and infrastructure projects. Our temporary Power Line Diversion keeps the transmission line energised while the permanent alignment is relocated, helping your project stay on schedule.
National and state projects run to tight schedules and a live transmission line across the alignment can hold them up for weeks. Shifting or relocating that line usually needs a shutdown the grid can't give. HTSE installs a temporary ERS bypass, so the corridor stays energised while the crossing tower is raised, relocated or diverted. The line keeps supplying power and your build keeps moving.
Once the permanent line sits in its new position, we dismantle the ERS and take it away. You get the clearance you need, without a long outage or the penalties it brings.
Transmission Line Shifting is the relocation or diversion of an existing transmission line to clear the way for highways, railways, metros and other infrastructure projects. HTSE uses ERS Towers to create a temporary bypass, allowing construction to continue while the live line remains energised.
Yes. HTSE deploys ERS Towers to create a temporary Power Line Diversion, allowing Transmission Tower Relocation with only a short switching outage. The transmission line remains energised while the permanent relocation is completed.
Either the utility or the project authority can engage HTSE. We coordinate with all stakeholders and deliver the complete solution including survey, engineering, Transmission Line Shifting, installation and removal of the ERS Towers.
HTSE installs ERS Towers beside the existing line and transfers the conductors onto the temporary structure. This allows the permanent tower to be relocated or rebuilt while power continues to flow through the temporary bypass.
Yes. ERS Towers provide temporary transmission support while permanent towers are raised, relocated or replaced to achieve the required road or railway clearance, keeping the transmission line operational throughout the project.
ERS Towers can remain deployed for days or several months, depending on the project schedule. HTSE designs every temporary Power Line Diversion to operate safely until the permanent transmission line is commissioned.
Send us the alignment and the crossing details, and HTSE will design a diversion that keeps the line live while you build. We respond 24/7, pan-India.