Keep critical transmission lines in service during maintenance, reconductoring and upgrades with HTSE’s IEEE 1070 & IEC certified Temporary Transmission Towers. We engineer, transport, erect and remove the complete ERS Tower bypass, minimizing downtime while keeping power flowing.
HTSE provides Temporary Transmission Towers for maintenance, reconductoring and transmission line upgrades. Our IEEE 1070-certified Temporary Bypass Transmission Tower creates a live bypass that allows work on the permanent structure while electricity continues to flow. The modular aluminium-alloy ERS Tower is rapidly deployed without civil foundations or heavy lifting equipment, reducing planned outages, protecting revenue and maintaining grid reliability.
After the upgrade is complete, we dismantle the ERS Tower and restore the route, giving you a faster, safer and more cost-effective maintenance solution.
HTSE provides Temporary Transmission Towers and ERS Tower solutions for planned maintenance, reconductoring, tower replacement, voltage uprating and temporary line diversions, keeping critical transmission corridors energised throughout the project.
From engineering and transport to installation and dismantling, HTSE provides complete Temporary Transmission Support using IEEE 1070 & IEC certified ERS Towers. Keep transmission corridors live while your teams complete maintenance safely and on schedule.
Own an IEEE 1070 & IEC certified ERS Tower system for rapid deployment across 33 kV-800 kV transmission lines. HTSE supplies a complete Emergency Restoration System with custom engineering, commissioning, crew training and technical support so your organisation is always prepared for emergency restoration and planned maintenance.
Yes. When a corridor is uprated to a higher voltage, the towers usually need to be raised or rebuilt for extra clearance. A temporary bypass keeps the existing line live while that work happens, so the uprating proceeds without a long outage and the upgraded line is commissioned on schedule.